This article and others that follow will be devoted to home repair work and improvement dealing with different areas from roofing system to basement.
If you are going to re-do the restroom floor-- this indicates using up your tile, sheet vinyl, or ceramic tile and underlayments you must make certain there are no indications of water damage to the subflooring and inspect to see if it is solid throughout. When laying down a new floor the primary question is always can I lay tile over the existing floor or do I need to pick up the old one initially? If the flooring is level and sound you can generally simply tile right over it with plastic or vinyl flooring, but remember how much space you have for the restroom door, door frame and wall molding (if any) you may have to open or close the door from time to time!
If the underlayment is solid however not quit local plumbing company level you can utilize leveling embossers (like mortar) to fill-in low areas to make a level surface, otherwise put a new underlayment over it, if you can. I have actually seen homeowner doctor it up with thin plain wood strips don't do it! All materials need to be water and moisture resistant as possible. Always utilize at least a 3ft level to guarantee surface area is not slanted in any way.
For a normal ground level home like a cattle ranch without any basement, floor foundations are 'framed', meaning the flooring rests on joists with 2-by's (stills) running perpendicular to the joists along the structure. 'Girders', (metal rods) at or near the center of the joists help in support. Above the framing lays the subfloor, generally a 3/4 ″ tongue and groove particle board, plywood or comparable material. Above that there is a1/4 ″ plywood or cement board (moisture resistant) thats called the underlayment and may also have a sheet of roof felt or comparable material for added cushioning. Take additional care when laying underlayment over the subflooring due to the fact that the flooring might crack if the seems compare so it's best to stagger the seams.
Ceramic Tiles: Because this type of tiling has actually ended up being popular in kitchens, bathrooms, halls and even living rooms for its resilience and style, I wish to commit this section on the subject.
Setting up ceramic tiles in the bathroom will modify the height of fixtures like toilets, vanity sinks and cabinets along with the door and adjoining space it is best to get rid of everything and start from scratch. This implies removing the old underlayment too. You need to create a level surface or the tiles will split or break. Most ceramic flooring tile is thick so you will have up to added to the old floor assuming you had plastic tile or vinyl to start with. You will be balancing out the height of the old fixtures and the door so a bit of cutting may be required (If you are replacing fixtures-no problem).
For tiling restroom floorings these actions will give you excellent results:
* Using a 3/ft level check if the flooring even throughout.
* Lay out a row of tiles, with spacers (cross formed inserts for grout lines) along the length and width of the room to assess the number of tiles you are utilizing. This is also to see the number of tile cuts you will need to make near walls.
* Lay down cement board, cut to fit area and use a small layer of mortar to connect board to subflooring. Usage screws every 6 to 8 inches along the edges of board to protect in location. Use mesh tape over the joints and cover with a thin layer of mortar.
* Using a trowel use mortar about every 3 1/2 at a time and use smooth even strokes.
* Set the complete ceramic tiles at a point furthest from doorway and press down strongly, tapping it with a rubber mallet so it spreads out evenly. Have the cut tiles all set so as you move away from the wall place and set as you go.

* insert cross shaped spacers on end in between each tile to insure rows are even. At corners lay spacers flat and butt tiles at the angles (dont worry, it will be same with). You can likewise stand the spacers upright against walls.
* When you get to the closet flange (toilet hole in flooring) you will need a tile nipper or tile saw to cut nearest plumber a partial circle. Do this for all sides and lay tile down as previously. You must do this also for sinks and cabinets.
* When all the tiles are down you should wait a least one day for it to set appropriately this is an essential action before you put down the grout. When ready, mix tile grout to cover about of the space at a time, this will offer you time to do to right. Get the cross spacers and use grout with a grout float, then holding float at an angle squeeze off excess grout. Do this with action with the remainder of the room.
* The last step is to dampen a clean sponge with water and wipe off the access grout, rinsing the sponge frequently.