Main phases of repair works in the apartment 56695
Main stages of repair in the apartment.
How to start repair works of the apartment?
The first phase of the repair work of old homes is the damage and taking apart first of all of the shabby walls and partition walls, removing the wall and ceiling finishing. This phase is among the most "dirty" stages of the repair work.
One more among the most important and "dirty" works is the window block replacement. It is required to do this first of all due to the fact that dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is needed to pack them immediately in polyethylene film and to cover windowsills in addition by the fiberboard (in order to avoid scratches).
The following phase is circuitry. Electrical wiring can be installed in walls or along the flooring. Wiring is made inside the pipelines to ensure electrical security and boost reliability. The pipeline safeguards circuitry from external damages and enables to replace the wire entirely without breaking walls and floor just by inserting the new wire instead of the old one.
House Painting follows the wiring. The regular error throughout the simultaneous conducting of such works occurs when employees forget to lay out one of the cables and home painters have already plastered and smoothed out the wall. As an outcome, extra works are needed to seal goes after on the ended up wall. The places of the feed switch and wall outlet area and their number should be thought-out beforehand. The plan of power wiring is normally consisted of into the style project.
Later on the system need to be prepared to service in case of failures. In addition to the circuitries, the telephone cable and the television cable are set out. The power cable should not be laid out near the telephone and antenna cable televisions to avoid sound pickup and interference. The most peculiar minute is setting out the television cable. In order to make two (or 3) TV sets in the house the second cable television is frequently simply "strongly soldered" in parallel, so the cable resistance is reduced. As a result, the screen quality is degraded, lots of programs can't be received and etc. In order to prevent such situation it is needed to invite a specialist with special devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is conducted simultaneously in all facilities, if it is possible. Hold-ups are related to the innovation. Each used layer of the plaster (or completing completing) must dry entirely before the work will continue.
Works in hygienic plans and the kitchen begin concurrently with home painting. It is better to fulfill so-called "dirty" operate in the top place and simultaneously. In accordance with the strategy of the hygienic technician place welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.
Then operates in hygienic arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other hygienic devices, mixers and devices are mounted.
After circuitry, setup of rosette plates and terminal boxes the voltage is checked in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not Hastings plumbing repairs installed during this stage in order to save their surface area appearance. The finish puttying of walls is carried out simultaneously. The highly specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines wetness of the material.

The following phase is the process of fill. Fill can be made with various materials-- from typical masonry cement-sand mix to self-aligning floors. The benefit of the easy mixture is its cheapness, the downside is that such mix is much more difficult aligned at the level and the final dry time of such fill is 40 days, only then the next stage of the work with floor can be performed, i.e. the period is too long. Self-leveling self-aligning floors are a lot more pricey, however more technological. Lining up happens almost "automatically" i.e. fluid service of mixture is put out, then it runs and you get the horizontal surface area. The last dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is installed into the fill. If the so-called "wet processes" are inapplicable the technology of the dry lining up (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are set up. Installation of doors should take into the account thickness of future flooring covering. After setup the door can be taken off its hinges and got rid of till completion of repair or loaded into polyethylene movie to secure from damages. At the same time ceiling can be painted and the tile can be laid in that properties where it was planned. The tile needs to be laid on the absolutely dry overlay.
Finishing of the flooring mounting depends on the prepared covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.
In facilities where surface covering of the floor is laminated floor covering or parquet hoard, the ordinary wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed effect is connected just with such rushing process when the fantastic quantity of dust is developed. In spite of the reality that excellent floor mills are equipped with the vacuum cleaner, the sufficient amount of dust is precipitated on surrounding topics consisting of walls. Dust is very acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be finished. It is left just to set up the plinths, ornamental aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is necessary to note that the series of works was noted in basic and can alter depending on the guaranteed circumstance-- the variety of spaces in property, your resources, peculiarities of the construction of the multilevel facilities. It is based upon common sense and everyone efficient in analysis can individually create such a sequence.