Main phases of repair in the house 51367
Main stages of repair works in the apartment.
How to begin repair of the apartment?
The first stage of the repair work of old apartment or condos is the destruction and dismantling firstly of the dilapidated walls and partition walls, getting rid of the wall and ceiling finish. This stage is one of the most "filthy" phases of the repair work.
One more amongst the most crucial and "dusty" works is the window block replacement. It is essential to do this to start with due to the fact that dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows throughout painting and wallpaper works (big drops of the temperature level and wetness are unallowable). After mounting windows and windowsills it is needed to load them instantly in polyethylene film and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is electrical wiring. Circuitry can be set up in walls or along the floor. Electrical wiring is made inside the pipes to ensure electrical safety and increase affordable plumbing company reliability. The pipeline secures electrical wiring from external damages and permits to replace the wire totally without breaking walls and floor just by inserting the brand-new wire rather of the old one.
House Painting follows the circuitry. The regular mistake during the simultaneous conducting of such works takes place when workers forget to lay out among the cable televisions and house painters have actually already plastered and smoothed out the wall. As a result, additional works are necessary to seal goes after on the completed wall. The locations of the feed switch and wall outlet location and their number must be thought-out beforehand. The plan of power electrical wiring is usually consisted of into the style project.
Later on the system must be prepared to service in case of failures. In local plumber near me addition to the circuitries, the telephone cable and the TV cable television are set out. The power cable television must not be set out near the telephone and antenna cable televisions to avoid sound pickup and disturbance. The most strange minute is setting out the TV cable television. In order to make two (or 3) television set in the apartment the second cable television is frequently simply "securely soldered" in parallel, so the cable television resistance is reduced. As an outcome, the screen quality is weakened, lots of programs can't be received and etc. In order to prevent such situation it is essential to invite a specialist with special equipment. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is performed simultaneously in all properties, if it is possible. Delays are linked with the technology. Each applied layer of the plaster (or filling in finishing) must dry totally before the work will continue.
Works in sanitary plans and the kitchen start all at once with home painting. It is better to fulfill so-called "dirty" operate in the top place and concurrently. In accordance with the plan of the sanitary technician location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then works in hygienic plans are performed according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is assembling ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and devices are mounted.

After circuitry, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not set up during this phase in order to conserve their surface appearance. The surface puttying of walls is conducted simultaneously. The highly specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.
The following stage is the procedure of fill. Fill can be made with different products-- from usual masonry cement-sand mixture to self-aligning floorings. The advantage of the simple mix is its cheapness, the downside is that such mixture is much more difficult aligned at the level and the last dry time of such fill is 40 days, only then the next stage of the work with floor can be carried out, i.e. the duration is too long. Self-leveling self-aligning floors are much more costly, but more technological. Aligning occurs practically "immediately" i.e. fluid service of mix is put out, then it runs and you get the horizontal surface. The final dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill technology) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are installed. Setup of doors should take into the account density of future floor covering. After setup the door can be removed its hinges and removed until completion of repair work or packed into polyethylene movie to safeguard from damages. Simultaneously ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the definitely dry overlay.
Finishing of the flooring installing depends on the planned covering. For the most part (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is completed, experienced plumbing company wallpaper for painting can be pasted on walls.
In facilities where surface covering of the flooring is laminated flooring or parquet stockpile, the normal wallpapers are pasted (not for painting) in the very first place. Then the floor covering is mounted.
If surface covering of reliable plumbing services the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned repercussion is linked just with such rushing procedure when the terrific amount of dust is created. In spite of the truth that good flooring mills are geared up with the vacuum cleaner, the sufficient amount of dust is sped up on surrounding subjects consisting of walls. Dust is very acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be finished. It is left only to install the plinths, decorative components, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is required to keep in mind that the sequence of works was noted in basic and can alter depending on the definite circumstance-- the number of rooms in property, your resources, peculiarities of the building and construction of the multilevel properties. It is based upon good sense and every person efficient in analysis can individually create such a series.