Build an ADU on My Property: Utility Capacity Checklist 17479
An accessory dwelling unit lives and dies on infrastructure. Plans and finishes get all the attention, but the piece that determines funds, schedule, and livability is routinely the invisible net of pipes and wires under your ft. If you’ve typed “build an ADU on my assets” or which is called an ADU contractor close me, you’ve already felt the tug of permitting and planning. Before you signal with an ADU development manufacturer, model out software potential. It is the difference among a smooth 4-month build and a 9-month odyssey with shock replace orders.
What follows is a practical walk with the aid of the colossal 5 utilities that govern ADU feasibility: electrical, water, sewer, gas, and details. I’ll point to true constraints I’ve viewed in the discipline, the order I run means exams, and the trade-offs that prevent tasks heading in the right direction. Whether you’re running with an ADU layout and construct workforce or you’re an proprietor-builder with a pleasant ADU everyday contractor, this guidelines will aid you ask sharper questions and stay clear of highly-priced remodel.
Start with a website study: what that you can examine in an hour
Before a single engineer opens a spreadsheet, you can accumulate records on a Saturday morning. Locate the electrical meter and panel, discover the water meter and shutoff, trace the sewer cleanout, and stroll the path from the road utilities to the deliberate ADU. If you notice an extended, slim area yard, overhead force crossing your yard, or mature roots running along the fence line, count on coordination time. I carry a standard non-contact voltage tester, a line locator if reachable, and a mobilephone loaded with the utility maps. Most cities offer approximate application layers on line, and that they’re worth reviewing no matter if they’re now not survey-grade.
Two rapid anecdotes underline why this things. A %%!%%27178c53-third-4401-9acd-b5d8010d1aca%%!%% in a Fifties bungalow swore the panel was “new,” and it become, but the service drop and meter have been now not. We had 200 amps within the panel, one hundred amps at the meter. That mismatch prompted a service improve and a three-month wait with the strength employer. Another %%!%%27178c53-1/3-4401-9acd-b5d8010d1aca%%!%% had an ideal sewer line on paper. The cleanout turned into attainable, the road pitched wisely, but the path to the recent ADU crossed a vast liquidambar with roots the scale of your forearm. The trench ended up snaking around in a shallow S to dodge structural roots, and the plumbing crew essential yet another day.
Those early observations structure a pragmatic approach. You don’t desire fancy methods to see whether or not you’re feeding a garden residence across 20 feet of garden or throughout 120 toes of concrete, clay, and tree roots.
How much electric capability you particularly need
ADUs are strength-hungry in comparison to a garage or studio. The moment you switch to all-electrical, the weight climbs: warmth pump house heating and cooling, warm pump water heater, induction cooking, and a code-required laundry circuit. Even a modest four hundred to 800 rectangular foot unit can pencil to 50 to ninety amps relying on equipment preferences. Many jurisdictions permit a calculated load via the NEC, which many times is available in cut down than a naïve sum of breaker scores, yet you still must recognize real-world usage.
The first fork in the street is regardless of whether to subfeed from the most important condominium panel or deploy a dedicated carrier for the ADU. Subfeeding is inexpensive and faster in the event that your present provider can deal with it. Dedicated carrier gives you independence, separate metering, and upkeep flexibility, however it brings a software program, trenching to the transformer or service factor, and often a new pole riser or pad-mount coordination.
When I act as an ADU assignment contractor, I pull the remaining one year of electric debts to determine historic demand for the major residence. If the house owner has critical AC or an EV charger, the height month tells me plenty. I also carry out a load calculation for the two dwellings Palo Alto adu design guidelines collectively. With warmth pump structures, LED lighting fixtures, and a one hundred twenty-volt warmth pump water heater, I can in general preserve an ADU below a 60-amp subfeed. If the foremost abode has a 2 hundred-amp service and a pretty good unfold of hundreds, that’s usually conceivable.
Panels themselves topic. A so-often known as “2 hundred-amp” panel from the Nineteen Nineties with aluminum bus and little breaker space isn't very similar to a smooth 2 hundred-amp panelboard with copper bus and room for AFCI/GFCI breakers. Service conductors, meter/principal rankings, and the provider drop or lateral all have got to healthy the final provider rating. Utilities will no longer upsize the meter simply on account that the panel inner says two hundred. An accessory home unit builder who shrugs at those facts is surroundings you up for difference orders.
If you choose all-electric, plan wherein the outside condensers, disconnects, and provider kit will move. Noise, setbacks, and transparent running space follow. If the ADU wall house is tight, a small outside-rated subpanel on a concrete pad near the unit mostly makes sense. I’ve used NEMA 3R enclosures with a 60-amp leading breaker for sparkling installs whilst internal partitions were claimed by plumbing chases and home windows.
EV readiness can tilt the equation. Even if the ADU does no longer require a charger, many owners plan to feature one later. A shrewdpermanent panel or load leadership device can defer a service improve by using shaving peak so much. The better ADU production mavens will charge those possibilities early and compare them to a software provider swap.
Water furnish: pressure, meter dimension, and pipe runs
Water seems realistic until eventually you measure rigidity below simultaneous movement. An ADU provides one toilet minimal, most of the time a second bathtub or laundry, and typically a kitchen with a dishwasher. If you tee off the main apartment, you would have to be sure that the static and dynamic pressure will beef up either dwellings at some point of top use. Cities usually settle for a 3 to 5 gallons-in line with-minute circulation take a look at at a hose bib plus a pressure examine on the meter or principal valve. I want to check two furniture directly to simulate authentic lifestyles, let's say shower plus kitchen sink. If your tension drops under 35 psi at some stage in that simultaneous draw, quite at the home’s some distance furnishings, the ADU will probably suffer.
Meter dimension things. A five/8-inch or three/4-inch meter serves such a lot unmarried-kin properties. With an ADU, some jurisdictions require an upsized meter or even a dedicated 2nd meter. Others allow a shared meter however require a backflow machine and a separate shutoff to the ADU. Upsizing a meter has ripple fees: the monthly base value by and large rises, and one can need to upsize the provider line from the street to the residence, this means that trenching under drives and landscaping. I have obvious meter enhancements upload 4 to eight weeks for water district approvals, noticeably in smaller districts.
Pipe textile and trail are the place surprises disguise. Old galvanized metal provider lines choke with mineral buildup, reducing glide and rigidity. If you've gotten previous galvanized from the Forties or Fifties, including an ADU is the instant to update it with Type L copper or high-density polyethylene. The run to the ADU ought to care for frost depth in bloodless climates and steer clear of root zones in which manageable. On tight urban a good deal, I usually run a shared trench for water, vigour, and telecom, with true separations. This saves cost but calls for coordination so that the inspector indicators off spacing between utilities, as a rule 12 inches horizontal and 12 inches vertical separation minimum, with chronic above or in conduit.
For indoors distribution, PEX-A with residence-run manifolds works properly for ADUs. It reduces fittings inside walls and makes long term upkeep less demanding. If you propose to meter the ADU’s water usage to allocate expenses, a submeter at the ADU’s bloodless-water foremost with a faraway read head maintains it tidy.
Sewer ability and the slope problem
Sewer is where expenditures can swing dramatically, and it's far the unmarried most natural area I see budgets blow up. A new bog workforce tied right into a old 4-inch cast iron line can work or it is going to expose cracks and roots that pressure a larger replacement. Start with the basics: in finding the key home cleanout and be told in which the constructing sewer heads to the public main. A practical digital camera inspection with finding gadget tells you intensity, slope, material, and circumstance. Most cities favor a 2 percentage minimal slope on new constructing drains, meaning a quarter inch in keeping with foot. If your ADU sits at the back of the top element of the yard, hitting that slope with out going too shallow at the connection is from time to time not possible devoid of a pump.
Pumps are usually not a failure, however they do devote you to lengthy-term repairs. Ejector pumps need venting, potential, and an obtainable basin. For tiny ADUs, a macerating pump behind a rest room can paintings, yet for a full bathroom and laundry you prefer a appropriate grinder or solids-managing ejector basin set outdoor or under a slab. When I can, I layout the ADU floor elevation to permit gravity drainage, even when adu construction options Palo Alto it ability just a few steps up on the access. Two risers at the threshold now can retailer countless numbers over the life of the building in pump replacements and alarms.
If you tie into the general public foremost, there are two predominant concepts: a wye connection for your existing lateral or a new tap at the key in the street. Tapping the key triggers encroachment enables, site visitors manipulate, and application finding. Costs fluctuate broadly, from a number of thousand on a quiet residential lane to 5 figures on a hectic arterial with concrete and rebar paving. This is the place having ADU consultants who know the nearby public works team will pay off. Some cities are bendy about tapping on the sidewalk cleanout, others require a brand new wye at the most regardless.
One extra layer: some jurisdictions require separate sewer ability expenditures for ADUs, calculated in equivalent residence sets or fixture counts. The selection is large, from a few hundred greenbacks to greater than ten thousand. Your ADU contractor must affirm this early, as it impacts feasibility and the choice to embody a second rest room or laundry.
Gas or all-electrical: pick your lane on day one
If you're keen on fuel cooking and have an present gas provider, including gasoline to the ADU is you'll, yet it drags along venting, combustion air specifications, seismic valves, and carbon monoxide considerations. In many regions, going all-electric powered simplifies the build and pairs good with photo voltaic. I like warmth pump water warmers for ADUs considering the fact that they sip potential and might stay in a small mechanical closet while you plan for makeup air. The noise is simple, but I still area them clear of dozing regions whilst manageable.
When we do add fuel, we run a dedicated line with an outside shutoff and a meter if allowed. I circumvent tying the ADU gasoline off a future throughout the leading space considering the fact that tension drops are elaborate in older black iron techniques. If your main apartment has a 2 hundred,000 BTU furnace and a tank water heater, the achievable BTU ability on that 1/2-inch run to the again would possibly not improve a new a hundred and twenty,000 BTU tankless plus a selection.
More cities have followed achieve codes that encourage or require electrical appliances in new work. An ADU abode builder who stays recent will flag this. Even if gasoline is authorized, insurers and appraisers a growing number of view all-electrical ADUs as easier. That issues on your refinance or sale later.
Drainage, stormwater, and fireplace: the quiet constraints
Stormwater slightly displays up on many ADU checklists, yet it has the strength to stall a build. Your new roof, patio, and walkways upload impervious enviornment. Some towns require on-web page infiltration for introduced rectangular footage above a small threshold. If your soil percolates poorly, it's possible you'll need drywells or shallow infiltration trenches. Plan leader destinations, keep away from dumping new roof water onto a neighbor, and verify downspout discharges have strong daylighting. In wildfire-susceptible areas, fire water availability and hydrant spacing can shape the footprint. A hearth division review would require a much wider driveway for get right of entry to or a hearth-rated wall inside a certain distance of the assets line. Those necessities cascade into software routes and equipment clearances.
Telecom and tips: small choices, massive livability
Data is not very a luxurious anymore. A 600 rectangular foot ADU used as a house place of work or apartment ought to have risk-free cyber web. Running a conduit for fiber or Cat6 from the main dwelling or from the carrier’s demarcation rates little or no at some point of trenching and saves complications later. Wireless bridges are a stopgap, not a plan. I specify a 1-inch empty conduit from the key distribution element to the ADU with a pull string. If you've the trench open for chronic and water, drop the archives conduit at the traditional separations. A neat set up with a small dependent media panel throughout the ADU helps to keep modems and routers off the kitchen counter.
The order of operations that stops rework
I’ve observed a steady sequence that cuts chance. First, tough site learn and application mapping, inclusive of a sewer digital camera. Second, load calculations and quick calls with the vitality and water utilities to be certain policies on meters and services. Third, initial civil notes on drainage, trench routes, and tree coverage. Fourth, a communicate with the construction division to be sure regional quirks: backflow requirements, sub-metering suggestions, and fire get right of entry to. Only then can we finalize the ADU layout and build package deal for submittal. It is tempting to push plans sooner, but moving a bathroom 6 ft to hit a better sewer run for the period of design is low cost when compared to adding a sewage ejector all over framing.
An ADU clothier close me as soon as adored stacking the lavatory and kitchen at the similar wall to retailer plumbing costs. Good principle, incorrect wall. It turned into the best wall on the lot line that considered necessary a 1-hour fireplace rating. Penetrations, vents, and window dimension all needed to trade, and the kitchen format suffered. We solved it early considering the sewer line map pressured us to inspect that wall. These are the small dominoes that fall your manner when utilities lead the design.
Budget degrees and where the cost hides
Numbers vary by using zone, but some patterns keep. Electrical enhancements when you would subfeed: a few thousand for a subpanel, trenching, and circuits to the ADU. Dedicated carrier: usally eight,000 to 20,000, greater if the application would have to set a new transformer or if the service lateral requires side road work. Water tie-in with enough rigidity: one to 5 thousand, greater for those who would have to upsize the meter or service line, that can leap by way of five,000 to 15,000 based on distance and paving. Sewer connections to latest lateral: 3 to 10 thousand, assuming remarkable condition. Street faucets: ten to thirty thousand with visitors manipulate. Ejector pump strategies: four to eight thousand hooked up, plus long run preservation.
Palo Alto adu local regulations
Hidden quotes love tight areas. A slender edge backyard capability hand trenching. Mature bushes suggest arborist oversight and protective tunneling below roots. Concrete and hardscape demolition multiply trench prices. If you hear an ADU reworking contractor advise application allowances with no a domain visit, push for a good stroll-by and written exclusions.
Permits, inspections, and the rhythm of coordination
Each software has its personal jurisdiction and speed. Power organisations have their service planners, water districts have backflow coordinators, public works controls the street, and building departments money code compliance. Your ADU builder’s job is to choreograph those avid gamers in order that inspections come inside the correct order. For instance, the ditch for a shared utility direction might want inspection by the pressure software, the water district for the carrier line and backflow, and the construction inspector for conduit intensity and separation. If that trench receives backfilled too early, one can reopen it.
Expect two to three utility inspections beyond widely used building inspections. If your ADU building visitors claims they could construct in eight weeks, ask how they account for application lead occasions. Transformer upgrades can take 8 to sixteen weeks in busy areas. Water meter swaps could be rapid or slow relying on staffing. If your schedule shows backfill beforehand inspections, press pause.
A clear-cut ability listing you can use together with your team
- Electrical: panel and carrier ranking proven, load calculation for equally dwellings, software stance on subfeed vs. dedicated meter, EV and heat pump rather a lot accounted for, kit places mapped with clearances.
- Water: meter length and stress tested, provider line drapery proven, trail to ADU planned at properly intensity, backflow and shutoff specifications cited, submeter choice made if favored.
- Sewer: digicam inspection entire with map and depth, slope feasibility checked, connection methodology selected, pump desire evaluated, ability expenditures verified with the district.
- Gas: coverage decision on all-electric vs. fuel, plausible BTU skill if utilizing existing formula, meter and regulator plan if including gas, venting and combustion air routes recognized.
- Data and stormwater: devoted information conduit deliberate, roof drainage routes designed with discharge places, infiltration necessities and hearth access notes captured.
Print it, hand it for your ADU gurus, and make them preliminary every one line until now design locks.
Picking the top accomplice and atmosphere expectations
The top ADU experts do now not recoil when you ask approximately provider rather a lot, meter sizes, and sewer slope. They pull out a notepad and caricature. They name the utility planner prior to deposit tests clean. They comprehend wherein to push for exceptions and wherein to persist with the regulation. A professional ADU contractor may even lend a hand you are making preferences that cut back top loads: warmness pump water heaters with timers, call for-responsive panels, or shared-laundry designs when compatible.
If you’re are searching for an ADU creation close me or interviewing an accessory residing unit builder, ask for two examples in which they averted a provider improve. Ask for one illustration where they really useful an upgrade and why. The tales will tell you greater than a shiny brochure. A custom ADU builder have to talk commerce-offs evidently. Separate electric carrier offers meter independence, yet can take months for application approval. Sharing the foremost area water line is swift, however may also in the reduction of power at height occasions if you happen to skip a meter improve. Trenching by a driveway provides expense, but occasionally avoids root wreck that might trigger a tree substitute requirement. There is not any unmarried right resolution, basically a match for your lot and price range.
Edge cases that deserve added attention
Sloped an awful lot create strange preferences. If the ADU sits downhill from the road major yet uphill from the present space lateral, gravity works. If it sits reduce than both, a sewer pump is unavoidable unless you reroute deep. Corner hundreds traditionally have two that you can think of sewer mains, one nearer yet shallower, the opposite deeper with superior fall. I’ve chosen the longer path more than once to avert a pump and future headaches.
Historic districts layer constraints on meter places and outdoors tools. You might desire to conceal a heat pump condenser in the back of a lattice or region the electrical meter on a facet elevation. Plan tools monitors early, or you'll be relocating tools overdue.
Wildland-urban interface zones can require defensible space around the ADU and may limit strength brand tools in selected zones. Check clearances for transformers and disconnects if your ADU sits near the rear fence where brush abuts the assets.
Flag a lot and panhandle driveways complicate get right of entry to for the application crews. If a bucket truck won't succeed in the pole in the back of your own home, the application would possibly require a new pole area or an underground lateral from a exceptional direction. I have coordinated weekend crane choices for pad-mount transformers in tight groups, and the can charge and time table influence changed into actual. Better to be trained that beforehand you draw the ADU’s porch.
Design selections that lighten the utility load
Smart design trims potential. A single compact loo core stacked with the kitchen retains plumbing short and focus vents. A one hundred twenty-volt warm pump water heater draws much less than 0.5 the spike of a tankless gas with its fan and ignition, and avoids the need for devoted fuel. Induction cooking looks like gasoline devoid of the combustion products, and it slashes air flow needs. Mini-break up warm pumps with one or two indoor heads serve maximum ADUs smartly, with outdoor gadgets placed on vibration pads far from bed room windows. Low-move furniture are normal now, yet I still specify 1.28 gpf bogs and EPA WaterSense showers to hinder water demand modest. These possibilities basically imply one can sidestep upsizing the water meter and service.
On the electrical side, a load-shedding sensible panel can dynamically pause the water heater throughout an EV cost, allowing each dwellings to share a two hundred-amp provider. Right-sizing lighting with LEDs and restricting exterior lights to valuable paths continues the base load down. These are the particulars a thoughtful ADU development facilities workforce will fold into their specs so you avert overbuilding the spine.

The function of documentation: draw it as you’ll build it
When I organize building data for an ADU, I insist on utility plans with authentic distances, depths, and materials. A obscure note that reads “run new electrical to ADU” leaves room for disputes. A plan that displays a 60-amp subfeed in 1.25-inch PVC, 24 inches burial intensity, 18-inch separation from water, and stub-america distinctive destinations makes inspections smoother. The equal goes for water and sewer: specify pipe sizes, slopes, cleanouts, and backflow devices. Add a element for the ejector basin if used, with vent routing and alarm area. The ADU installation providers staff presentations up with the proper tools, and the ADU creation professionals can rate correctly.
Keep copies of software approvals in the enable set: provider improve letters, water meter upsizing confirmations, and sewer potential commission receipts. Inspectors realize seeing them without looking through emails. When you promote or refinance, that record proves the ADU isn't a bootleg.
When to usher in specialists
Most ADU contractors take care of primary software coordination, but edge cases name for engineers. A civil engineer is worthy their price whenever you touch the road for sewer or whilst stormwater requires infiltration design. An electric engineer’s load calc carries weight with utilities for those who’re almost about the minimize. A geotechnical engineer allows if you happen to trench close full-size bushes and need to protect roots or whilst soil contains high groundwater nearly trench depths. These experts is usually engaged surgically. A awesome ADU creation agency is familiar with who to call and while.
If you might be appearing as owner-builder, think hiring an ADU pros equipment for preconstruction simplest. A 0.5-day check with to check utilities, perform a load calc, and comic strip a trench plan can shop weeks and heaps. Then which you could still bid the exercise session to a mix of trades with a clean scope.
Pulling it together: a pragmatic path to a livable ADU
The cleanest ADU builds I’ve controlled followed a steady rhythm. We mapped utilities early, made two or 3 design differences to appreciate slope and panel house, then submitted a allow set with factual numbers. While the city reviewed the plans, we queued software applications for any enhancements. As quickly as lets in issued, we opened the trench as soon as, located persistent, water, sewer, and tips to the ADU, and invited all vital inspectors in a two-day window. The slab or starting place observed with trust that no person could ask us to reopen the backyard. Framing and finishes ran without software surprises, and the final sign-offs felt activities.
If you take simply one lesson from this checklist, allow it's this: utilities are usually not an afterthought, they may be the backbone. A customized ADU builder who treats them that method will offer you a less difficult, quicker, and more predictable venture. Whether you opt a complete ADU layout and build firm or compile your very own ADU contractor team, press for specifics on capacity, routing, and approvals. Clarity now maintains your long term tenant from showering in a trickle or resetting a sewer pump alarm in the dead of night.
When you look up an ADU contractor close to me, listen for those who lead with questions about your meter, your panel, your sewer cleanout, and your water tension. Those are the ADU creation consultants who will assistance you dwell with no trouble for your new space, with no surprises beneath the soil.