Main phases of repair works in the house 34038

From Wiki Spirit
Revision as of 10:32, 12 August 2025 by Meirdaqlii (talk | contribs) (Created page with "<html><p> Main stages of repair in the apartment.</p><p> </p>How to begin repair of the apartment?<p> </p>The first stage of the repair work of old apartment or condos is the damage and taking apart first of all of the worn out walls and partition walls, getting rid of the wall and ceiling covering. This stage is among the most "dirty" phases of the repair work. <p> </p>One more among the most essential and "dusty" works <a href="https://wiki-fusion.win/index.php/Buildin...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Main stages of repair in the apartment.

How to begin repair of the apartment?

The first stage of the repair work of old apartment or condos is the damage and taking apart first of all of the worn out walls and partition walls, getting rid of the wall and ceiling covering. This stage is among the most "dirty" phases of the repair work.

One more among the most essential and "dusty" works best plumbing services company is the window block replacement. It is needed to do this to start with because dirt and dust will be unallowable during following phases and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature and wetness are unallowable). After mounting windows and windowsills it is necessary to pack them right away in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following phase is electrical wiring. Electrical wiring can be installed in walls or along the floor. Electrical wiring is made inside the pipes to ensure electrical safety and increase reliability. The pipeline safeguards wiring from external damages and allows to change the wire entirely without breaking walls and flooring simply by placing the brand-new wire rather of the old one.

House Painting follows the electrical wiring. The regular mistake during the synchronised conducting of such works takes place when employees forget to set out one of the cable televisions and house painters have actually already plastered and smoothed out the wall. As an outcome, extra works are needed to seal chases after on the ended up wall. The locations of the feed switch and wall outlet area and their number must be thought-out in advance. The scheme of power wiring is usually included into the design project.

Later on the system need to be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable are laid out. The power cable television must not be set out near the telephone and antenna cables to avoid sound pickup and interference. The most strange moment is laying out the television cable television. In order to make two (or 3) television set in the home the second cable is often simply "firmly soldered" in parallel, so the cable resistance is lowered. As a result, the display screen quality is degraded, numerous programs can't be gotten and etc. In order to prevent such circumstance it is needed to welcome a professional with special equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted concurrently in all facilities, if it is possible. Hold-ups are linked with the innovation. Each applied layer of the plaster (or filling out ending up) should dry entirely before the work will continue.

Works in sanitary arrangements and the cooking area begin at the same time with house painting. It is much better to satisfy so-called "unclean" works in the top place and simultaneously. In accordance with the plan of the hygienic specialist area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then operates in hygienic plans are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying local best plumbing company tiles on the floor. And at last other hygienic gadgets, mixers and accessories are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not installed throughout this phase in order to conserve their surface area appearance. The finish puttying of walls is carried out concurrently. The technologically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines moisture of the material.

The following phase is the process of fill. Fill can be made with various materials-- from normal masonry cement-sand mix to self-aligning floors. The advantage of the basic mix is its cheapness, the disadvantage is that such mix is much more difficult aligned at the level and the last dry time of such fill is 40 days, just then the next stage of the deal with flooring can be performed, i.e. the period is too long. Self-leveling self-aligning floorings are much more expensive, however more technological. Lining up happens almost "automatically" i.e. fluid option of mixture is put out, recommended top plumbers then it runs and you get the horizontal surface. The final dry time is 15 days i.e. you have significant time economy. The system "warm floor" is installed into the fill. If the so-called "wet processes" are inapplicable the top plumbing solutions innovation of the dry lining up (the fill innovation) is utilized bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Installation of doors should take into the account density of future flooring covering. After installation the door can be taken off its hinges and removed up until completion of repair work or packed into polyethylene movie to protect from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile should be laid on the definitely dry overlay.

Finishing of the floor installing depends on the prepared covering. In most cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to provide the close repairing of plywood and long-term service of the floor without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After installing of the plywood is finished, wallpaper for painting can be pasted on walls.

In facilities where finish covering of the floor is laminated flooring or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed consequence is linked just with such rushing process when the terrific amount of dust is developed. In spite of the truth that great floor grinders are geared up with the vacuum, the adequate quantity of dust is precipitated on surrounding subjects including walls. Dust is extremely acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be ended up. It is left just to install the plinths, decorative aspects, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is required to note that the sequence of works was listed in basic and can alter depending on the certain circumstance-- the variety of spaces in property, your resources, peculiarities of the construction of the multilevel premises. It is based upon sound judgment and every person capable of analysis can individually create such a series.